Stack Stone Walls


Stack Brick Retaining Walls
BEFORE IM000461

* 3 Day project start to finish *                                         * Improve  Landscape *

* 504 Bricks , 1.5 yards gravel base *                              * Increase Home Value *

* Your design or ours *                                                      * Prevent Flooding *

* Fast clean and professional *                                         * Add Color *

* Cheaper than you think *                                                * Enhance Your Poolside *

* Step By Step installation *                                              * Change The Look *

DAY #1

DSC00037 DSC00032 IM000442

* Break cross ties apart * Stack ties safely out of the way * Dig back 10-12 inches * Discard excess soil * Dig footing 6-8 inches * Fill in with gravel footing *

DAY # 2

DSC00038 IM000446

*Pack gravel base *

* Level*

* Find Lowest area down the wall line *

* Ensure base is at least 10 inches wide *

* Ready for laying foundation *

DAY #3

IM000447 * Start laying bricks into place *

* Level as you lay bricks *

* Level at least 3 bricks at a time *

* Make sure bricks are straight in line *

* Stagger bricks each layer *

* Fill in dirt behind each layer *

Savannah Ga. residents:

For free estimates contact us at tntconcepts00@gmail.com or 912-695-1380.

FINISHED