Stack Stone Walls

* 3 Day project start to finish * * Improve Landscape *
* 504 Bricks , 1.5 yards gravel base * * Increase Home Value *
* Your design or ours * * Prevent Flooding *
* Fast clean and professional * * Add Color *
* Cheaper than you think * * Enhance Your Poolside *
* Step By Step installation * * Change The Look *
DAY #1

* Break cross ties apart * Stack ties safely out of the way * Dig back 10-12 inches * Discard excess soil * Dig footing 6-8 inches * Fill in with gravel footing *
DAY # 2

*Pack gravel base *
* Level*
* Find Lowest area down the wall line *
* Ensure base is at least 10 inches wide *
* Ready for laying foundation *
DAY #3
* Start laying bricks into place *
* Level as you lay bricks *
* Level at least 3 bricks at a time *
* Make sure bricks are straight in line *
* Stagger bricks each layer *
* Fill in dirt behind each layer *